Overview

Project

Emory UniversityMidtown Hospital – Hybrid Operating Rooms

Renovation in operational hospital. Structor Group demolished the existing interiors to the structure and built two hybrid operating rooms concurrently. Project included a new medical gas system, three private post anesthesia care units as well as oversite of installation of state-of-the-art Phillips equipment. Project challenges included creating a fully contained inclusion zone with negative air pressure to isolate construction from hospital operations. Three operating rooms in the suite remained in operation during construction.